Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Papa - Szennyviztisztito Telep
Hungary · official identifier HU-WWTP-AIB968
180,000h-e design capacity (2022) · 12th of 829 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIB968 · reported size 180,000 h-e design capacity · received load 79,003 h-e · reported treatment: PST · data year 2022. 12th of 829 records with reported size in the inventory of Hungary (tied with 1 others); 1.2 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.3288, 17.4400 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2016 · The 2016 municipal strategy proposed covering existing units and improving sludge management at the Pápa plant. Municipality of Pápa
Other published data
| Mean annual volume treated reported in the 2022 cycle | 2,510,809 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 79,003 p.e. of reported load; equivalent average load 70,065 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (7,742 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Nagyacsad - Szennyviztisztito Telep | 7.1 km | 716 | 600 | primary, secondary and tertiary |
| Kup - Szennyviztisztito Telep | 9.5 km | 3,000 | 2,900 | primary, secondary and tertiary |
| Nemesszalok - Szennyviztisztito Telep | 11.7 km | 2,041 | 2,250 | primary, secondary and tertiary |
| Beb - Szennyviztisztito Telep | 13.2 km | 5,844 | 5,300 | primary, secondary and tertiary |
| Gyarmat Szennyviztisztito Telep | 14.0 km | 1,375 | 1,350 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Papa - Szennyviztisztito Telep report?
Reported size: 180,000 h-e design capacity. Received load: 79,003 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Papa - Szennyviztisztito Telep?
Aguas SB simulator reference scenario for 79,003 p.e. of reported load: 2,208,053 kWh per year (31.5 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.