Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Pincehely (SBR) szennyviztisztito telep
Hungary · official identifier HU-WWTP-ARK172
2,480h-e design capacity (2022) · 533rd of 829
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-ARK172 · reported size 2,480 h-e design capacity · received load 1,595 h-e · reported treatment: PST · data year 2022. 533rd of 829 records with reported size in the inventory of Hungary; 0.02 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.6944, 18.4626 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Regulatory reference: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,595 p.e. of reported load; equivalent average load 1,412 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (156 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Miszla - Szennyviztisztito Telep | 6.8 km | 185 | 185 | primary and secondary |
| Simontornya - Szennyviztisztito Telep | 10.2 km | 4,480 | 3,100 | primary, secondary and tertiary |
| Mezoszilas - Szennyviztisztito Telep | 12.6 km | 1,720 | 1,720 | primary, secondary and tertiary |
| Cece Agglomeracios - Szennyviztisztito Telep | 14.5 km | 2,644 | 2,408 | primary, secondary and tertiary |
| Tamasi - Szennyviztisztito Telep | 14.8 km | 12,000 | 29,580 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Pincehely (SBR) szennyviztisztito telep report?
Reported size: 2,480 h-e design capacity. Received load: 1,595 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Pincehely (SBR) szennyviztisztito telep?
Aguas SB simulator reference scenario for 1,595 p.e. of reported load: 64,812 kWh per year (45.9 kWh per p.e. of average load), with aeration as 72 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.