Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Rad - Szennyviztisztito mu
Hungary · official identifier HU-WWTP-AGL475
1,835h-e design capacity (2022) · 604th of 829
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AGL475 · reported size 1,835 h-e design capacity · received load 2,150 h-e · reported treatment: PST · data year 2022. 604th of 829 records with reported size in the inventory of Hungary; 0.01 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 47.7781, 19.2188 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,150 p.e. of reported load; equivalent average load 1,910 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (211 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Vac - Szennyviztisztito Telep | 6.3 km | 116,666 | 137,655 | primary, secondary and tertiary |
| Szod - Szennyviztisztito Telep | 6.9 km | 2,050 | 3,306 | primary, secondary and tertiary |
| Puspokhatvan - Szennyviztisztito Telep | 11.0 km | 4,962 | 4,177 | primary, secondary and tertiary |
| Notincs - Szennyviztisztito Telep | 11.9 km | 3,667 | 3,276 | primary, secondary and tertiary |
| Bank - Szennyviztisztito Telep | 16.2 km | 890 | 440 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Rad - Szennyviztisztito mu report?
Reported size: 1,835 h-e design capacity. Received load: 2,150 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Rad - Szennyviztisztito mu?
Aguas SB simulator reference scenario for 2,150 p.e. of reported load: 86,034 kWh per year (45.1 kWh per p.e. of average load), with aeration as 73 % of consumption. Estimate with the country reference profile; not a measurement of the plant.