Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Sormas - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIB302

750h-e design capacity (2022) · 705th of 829 (tied with 6 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIB302 · reported size 750 h-e design capacity · received load 829 h-e · reported treatment: PS · data year 2022. 705th of 829 records with reported size in the inventory of Hungary (tied with 6 others); < 0.01 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.2 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

750h-e design capacity
829h-e received load (2022)
111 %reported load/capacity ratio (not hydraulic utilisation)
705th of 829by reported size among the 829 records with a size in the inventory (tied with 6 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.4676, 16.9182 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

36,277reference kWh per year for this load
49.5kWh per h-e (average load) per year
5,441€ per year at 0.15 €/kWh
67 %share of energy used for aeration

what this estimate is · Inputs: 829 p.e. of reported load; equivalent average load 733 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (81 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Nagykanizsa - Szennyviztisztito Telep6.2 km89,25090,493primary, secondary and tertiary
Petrivente - Szennyviztisztito Telep6.9 km204288primary and secondary
Ujudvar - Szennyviztisztito Telep9.0 km425780primary and secondary
Valkonya - Szennyviztisztito Telep9.2 km12047primary and secondary
Kisrecse - Szennyviztisztito Telep11.1 km19995primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Sormas - Szennyviztisztito Telep report?

Reported size: 750 h-e design capacity. Received load: 829 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Sormas - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 829 p.e. of reported load: 36,277 kWh per year (49.5 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.