Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Vertesacsa - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIC144

2,850h-e design capacity (2022) · 486th of 829 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIC144 · reported size 2,850 h-e design capacity · received load 3,189 h-e · reported treatment: PST · data year 2022. 486th of 829 records with reported size in the inventory of Hungary (tied with 1 others); 0.02 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,850h-e design capacity
3,189h-e received load (2022)
112 %reported load/capacity ratio (not hydraulic utilisation)
486th of 829by reported size among the 829 records with a size in the inventory (tied with 1 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates47.3851, 18.5715 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

124,553reference kWh per year for this load
44.0kWh per h-e (average load) per year
18,683€ per year at 0.15 €/kWh
75 %share of energy used for aeration

what this estimate is · Inputs: 3,189 p.e. of reported load; equivalent average load 2,833 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (313 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Csakvar - Szennyviztisztito Telep5.5 km5,5635,128primary and secondary
Lovasbereny - Szennyviztisztito Telep10.4 km2,6502,292primary, secondary and tertiary
Ujbarok - Szennyviztisztito Telep10.8 km9,6906,233primary, secondary and tertiary
Bicske - Szennyviztisztito Telep13.2 km20,23217,096primary, secondary and tertiary
Zamoly - Szennyviztisztito Telep13.8 km4,5903,792primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Vertesacsa - Szennyviztisztito Telep report?

Reported size: 2,850 h-e design capacity. Received load: 3,189 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Vertesacsa - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 3,189 p.e. of reported load: 124,553 kWh per year (44.0 kWh per p.e. of average load), with aeration as 75 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.