Worldwide wastewater treatment observatory · Iceland

Aguas SB Observatory · public data to understand water

WWTP Dalvik

Iceland · official identifier IS014-01

10,000h-e design capacity (2022) · 11th of 22 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IS014-01 · reported size 10,000 h-e design capacity · received load 9,840 h-e · reported treatment: T · data year 2022. 11th of 22 records with reported size in the inventory of Iceland (tied with 1 others); 1.3 % of the sum of those 22 records in h-e (sum of records, not national capacity); nearest inventoried plant at 26.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

10,000h-e design capacity
9,840h-e received load (2022)
98 %reported load/capacity ratio (not hydraulic utilisation)
11th of 22by reported size among the 22 records with a size in the inventory (tied with 1 others) · 1.3 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentterciario (más riguroso) (as reported to the EEA: T) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates65.9667, -18.5347 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Iceland

Regulatory framework of Iceland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

435,854reference kWh per year for this load
44.3kWh per h-e (average load) per year
65,378€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 9,840 p.e. of reported load; equivalent average load 9,840 p.e. with the reference profile of Iceland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,968 m³/day of reference), not measured or available for reclamation.

LOCATION

Iceland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Siglufjordur26.6 kmnot reported2,177not reported
Akureyri35.7 km100,00086,000primary
Husavik54.6 kmnot reported6,514not reported
Hvammstangi127.1 kmnot reported2,145not reported
Saudarkrokur145.1 kmnot reported26,086not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Dalvik report?

Reported size: 10,000 h-e design capacity. Received load: 9,840 h-e. Units are retained without conversion.

What treatment is reported?

Treatment T. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Dalvik?

Aguas SB simulator reference scenario for 9,840 p.e. of reported load: 435,854 kWh per year (44.3 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.