Worldwide wastewater treatment observatory · Iceland
Aguas SB Observatory · public data to understand water
WWTP Egilsstadavik (Egilsstadir)
Iceland · official identifier IS016-04
30,000h-e design capacity (2022) · 6th of 22
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IS016-04 · reported size 30,000 h-e design capacity · received load 29,500 h-e · reported treatment: P · data year 2022. 6th of 22 records with reported size in the inventory of Iceland; 3.9 % of the sum of those 22 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.6 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 65.2625, -14.4172 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Iceland
Regulatory framework of Iceland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 29,500 p.e. of reported load; equivalent average load 29,500 p.e. with the reference profile of Iceland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (5,900 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Melshorn/Votihvammur (Egilsstadir) | 1.6 km | 1,000 | 524 | not reported |
| Einbuabla (Egilsstadir) | 1.6 km | 1,000 | 629 | primary, secondary and tertiary |
| Manatrod (Egilsstadir) | 1.7 km | 1,000 | 488 | not reported |
| Fellabaer (Smarahvammur) | 2.7 km | 330 | 424 | primary and secondary |
| Neskaupsstadur | 36.3 km | 3,000 | 2,404 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Egilsstadavik (Egilsstadir) report?
Reported size: 30,000 h-e design capacity. Received load: 29,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Egilsstadavik (Egilsstadir)?
Aguas SB simulator reference scenario for 29,500 p.e. of reported load: 1,281,460 kWh per year (43.4 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.