Worldwide wastewater treatment observatory · Iceland
Aguas SB Observatory · public data to understand water
WWTP Vestmannaeyjar Hamar
Iceland · official identifier IS006-02
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IS006-02 · reported size not reported h-e design capacity · received load 7,861 h-e · data year 2022. nearest inventoried plant at 1.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 63.4362, -20.3028 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Iceland
Regulatory framework of Iceland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,861 p.e. of reported load; equivalent average load 7,860 p.e. with the reference profile of Iceland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,572 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Vestmannaeyjar Eiðið | 1.8 km | 15,000 | 23,584 | not reported |
| Hvolsvollur | 34.6 km | 3,000 | 2,408 | primary |
| Hella | 58.7 km | 10,000 | 4,869 | not reported |
| Selfoss | 65.4 km | not reported | 47,000 | not reported |
| Thorlakshofn | 70.8 km | 15,000 | 17,555 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Vestmannaeyjar Hamar report?
Reported size: not reported h-e design capacity. Received load: 7,861 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Vestmannaeyjar Hamar?
Aguas SB simulator reference scenario for 7,861 p.e. of reported load: 352,494 kWh per year (44.8 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.