Worldwide wastewater treatment observatory · Iceland

Aguas SB Observatory · public data to understand water

WWTP Vestmannaeyjar Hamar

Iceland · official identifier IS006-02

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IS006-02 · reported size not reported h-e design capacity · received load 7,861 h-e · data year 2022. nearest inventoried plant at 1.8 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
7,861h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates63.4362, -20.3028 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Iceland

Regulatory framework of Iceland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

352,494reference kWh per year for this load
44.8kWh per h-e (average load) per year
52,874€ per year at 0.15 €/kWh
48 %share of energy used for aeration

what this estimate is · Inputs: 7,861 p.e. of reported load; equivalent average load 7,860 p.e. with the reference profile of Iceland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (1,572 m³/day of reference), not measured or available for reclamation.

LOCATION

Iceland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Vestmannaeyjar Eiðið1.8 km15,00023,584not reported
Hvolsvollur34.6 km3,0002,408primary
Hella58.7 km10,0004,869not reported
Selfoss65.4 kmnot reported47,000not reported
Thorlakshofn70.8 km15,00017,555not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Vestmannaeyjar Hamar report?

Reported size: not reported h-e design capacity. Received load: 7,861 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Vestmannaeyjar Hamar?

Aguas SB simulator reference scenario for 7,861 p.e. of reported load: 352,494 kWh per year (44.8 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.