Worldwide wastewater treatment observatory · India
Aguas SB Observatory · public data to understand water
WWTP Bakh
The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): No source point coordinates; authors assigned satellite/map locations, or city/suburb centers when not reliably located. Includes non-operational and construction statuses.
India · official identifier HW:52663
13,362population served estimated by the source (people) (2015) · 430th of 520 (tied with 5 others)
HydroWASTE v1.0 / India · official identifier HW:52663 · size estimated by the source 13,362 population served estimated by the source (people) · reported treatment: Secondary · data year 2015. 430th of 520 records with size in the inventory of India (tied with 5 others) (this plant: a source estimate); 0.01 % of the sum of those 520 records in people served (sum of records, not national capacity) · size estimated by the source ; nearest inventoried plant at 29.5 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data scientific inventory · 2015
| Treatment | Secondary · reported levels |
|---|---|
| Reported coordinates | 29.5960, 79.6680 position validation in the source: high what it means |
| Source and year | HydroWASTE v1.0 / India · dataset record |
REGULATORY REFERENCES
Referencia normativa: India
Regulatory framework of India. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | reported population served (people) | Treatment |
|---|---|---|---|
| Bhimtal | 29.5 km | 8,351 | Secondary |
| Rushi | 30.0 km | 66,812 | Secondary |
| Near Bus Station | 110.4 km | 19,351 | Secondary |
| Ved Niketan | 143.0 km | 20,044 | Secondary |
| lakkarghat | 145.2 km | 40,087 | Primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Bakh report?
Size estimated by the source: 13,362 reported population served (people). Units are retained without conversion.
What treatment is reported?
Treatment Secondary. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · HydroWASTE v1.0 / India · data 2015 · edition 2015 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.