Worldwide wastewater treatment observatory · India

Aguas SB Observatory · public data to understand water

WWTP Bannur

The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): No source point coordinates; authors assigned satellite/map locations, or city/suburb centers when not reliably located. Includes non-operational and construction statuses.

India · official identifier HW:52191

25,723population served estimated by the source (people) (2015) · 389th of 520

HydroWASTE v1.0 / India · official identifier HW:52191 · size estimated by the source 25,723 population served estimated by the source (people) · reported treatment: Primary · data year 2015. 389th of 520 records with size in the inventory of India (this plant: a source estimate); 0.02 % of the sum of those 520 records in people served (sum of records, not national capacity) · size estimated by the source ; nearest inventoried plant at 19.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data scientific inventory · 2015

25,723reported population served (people)
389th of 520by size (source estimate) among the 520 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentPrimary · reported levels
Reported coordinates12.3460, 76.8580 position validation in the source: high what it means
Source and yearHydroWASTE v1.0 / India · dataset record

REGULATORY REFERENCES

Referencia normativa: India

Regulatory framework of India. Individual applicability is not determined in this profile.

LOCATION

India: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistancereported population served (people)Treatment
Srirangapatana19.2 km9,287Primary
Kesare Maysore21.0 km200,436Primary
Guttahalu Mandya21.7 km10,556Primary
Chikkegowdana doddi Mandya22.0 km61,467Primary
Vidyaranyapuram Maysorfe23.7 km201,751Primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bannur report?

Size estimated by the source: 25,723 reported population served (people). Units are retained without conversion.

What treatment is reported?

Treatment Primary. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · HydroWASTE v1.0 / India · data 2015 · edition 2015 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.