9,200h-e design capacity (2022) · 82nd of 191 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IETP_D0120 · reported size 9,200 h-e design capacity · received load 7,287 h-e · reported treatment: PST · data year 2022. 82nd of 191 records with reported size in the inventory of Ireland (tied with 1 others); 0.16 % of the sum of those 191 records in h-e (sum of records, not national capacity); nearest inventoried plant at 17.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 54.7985, -7.7802 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Ireland
Regulatory framework of Ireland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,287 p.e. of reported load; equivalent average load 7,285 p.e. with the reference profile of Ireland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,457 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Letterkenny | 17.6 km | 40,000 | 23,847 | primary, secondary and tertiary |
| Lifford | 19.5 km | 3,000 | 1,838 | primary and secondary |
| Donegal Town | 26.3 km | 12,000 | 5,098 | primary and secondary |
| Dungloe | 40.9 km | 2,400 | 1,544 | primary, secondary and tertiary |
| Buncrana | 42.0 km | 10,000 | 9,002 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Ballybofey/Stranorlar report?
Reported size: 9,200 h-e design capacity. Received load: 7,287 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Ballybofey/Stranorlar?
Aguas SB simulator reference scenario for 7,287 p.e. of reported load: 328,080 kWh per year (45.0 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.