Worldwide wastewater treatment observatory · Ireland

Aguas SB Observatory · public data to understand water

WWTP Ringsend

Ireland · official identifier IETP_D0034

1,640,000h-e design capacity (2022) · 1st of 191

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IETP_D0034 · reported size 1,640,000 h-e design capacity · received load 2,207,592 h-e · reported treatment: PST · data year 2022. 1st of 191 records with reported size in the inventory of Ireland; 29.0 % of the sum of those 191 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.1 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,640,000h-e design capacity
2,207,592h-e received load (2022)
135 %reported load/capacity ratio (not hydraulic utilisation)
1st of 191by reported size among the 191 records with a size in the inventory · 29.0 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates53.3561, -6.2897 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2026-02-26 · Completion of the €550 million Ringsend upgrade was announced. RTÉ

Other published data

Mean annual volume treated reported in the 2022 cycle158,953,485 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Ireland

Regulatory framework of Ireland · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

61,832,813reference kWh per year for this load
28.0kWh per h-e (average load) per year
9,274,922€ per year at 0.15 €/kWh
65 %share of energy used for aeration

what this estimate is · Inputs: 2,207,592 p.e. of reported load; equivalent average load 2,207,590 p.e. with the reference profile of Ireland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

161.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (441,518 m³/day of reference), not measured or available for reclamation.

LOCATION

Ireland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Swords12.1 km70,00059,101primary, secondary and tertiary
Shanganagh12.9 km186,000134,529primary and secondary
Lower Liffey Valley Regional Sewerage Scheme13.2 km150,000140,458primary, secondary and tertiary
Malahide13.9 km27,00022,465primary, secondary and tertiary
Portrane, Donabate, Rush, Lusk19.3 km65,00035,190primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Ringsend report?

Reported size: 1,640,000 h-e design capacity. Received load: 2,207,592 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Ringsend?

Aguas SB simulator reference scenario for 2,207,592 p.e. of reported load: 61,832,813 kWh per year (28.0 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.