Worldwide wastewater treatment observatory · Ireland

Aguas SB Observatory · public data to understand water

WWTP Roscrea

Ireland · official identifier IETP_D0025

26,000h-e design capacity (2022) · 41st of 191

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IETP_D0025 · reported size 26,000 h-e design capacity · received load 7,308 h-e · reported treatment: PST · data year 2022. 41st of 191 records with reported size in the inventory of Ireland; 0.46 % of the sum of those 191 records in h-e (sum of records, not national capacity); nearest inventoried plant at 17.1 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

26,000h-e design capacity
7,308h-e received load (2022)
28 %reported load/capacity ratio (not hydraulic utilisation)
41st of 191by reported size among the 191 records with a size in the inventory · 0.46 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates52.9545, -7.7944 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Ireland

Regulatory framework of Ireland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

329,144reference kWh per year for this load
45.0kWh per h-e (average load) per year
49,372€ per year at 0.15 €/kWh
48 %share of energy used for aeration

what this estimate is · Inputs: 7,308 p.e. of reported load; equivalent average load 7,310 p.e. with the reference profile of Ireland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,462 m³/day of reference), not measured or available for reclamation.

LOCATION

Ireland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Birr17.1 km12,00011,011primary, secondary and tertiary
Templemore17.9 km6,0002,559primary, secondary and tertiary
Mountrath22.1 km4,5002,416primary, secondary and tertiary
Banagher28.9 km3,0002,373primary and secondary
Nenagh29.1 km11,00011,576primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Roscrea report?

Reported size: 26,000 h-e design capacity. Received load: 7,308 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Roscrea?

Aguas SB simulator reference scenario for 7,308 p.e. of reported load: 329,144 kWh per year (45.0 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.