Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Agna_Via_Cimitero

Italy · official identifier IT05000000000219

6,200h-e design capacity (2022) · 1767th of 3,726 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000219 · reported size 6,200 h-e design capacity · received load 3,025 h-e · reported treatment: PST · data year 2022. 1767th of 3,726 records with reported size in the inventory of Italy (tied with 3 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.8 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

6,200h-e design capacity
3,025h-e received load (2022)
49 %reported load/capacity ratio (not hydraulic utilisation)
1767th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 3 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.1620, 11.9660 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

110,981reference kWh per year for this load
53.2kWh per h-e (average load) per year
16,647€ per year at 0.15 €/kWh
64 %share of energy used for aeration

what this estimate is · Inputs: 3,025 p.e. of reported load; equivalent average load 2,087 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (605 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Anguillara_veneta_via_ponte_loc_borgoforte2.8 km1,6001,267primary, secondary and tertiary
Cona_pegolotte6.2 km6,0003,504primary and secondary
Anguillara_veneta_via_olimpiadi6.4 km3,0002,375primary, secondary and tertiary
Conselve_via_dell_industria_zi6.8 km46,88028,686primary, secondary and tertiary
San_martino_di_venezze_via_borgo_sud8.1 km3,0002,709primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Agna_Via_Cimitero report?

Reported size: 6,200 h-e design capacity. Received load: 3,025 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Agna_Via_Cimitero?

Aguas SB simulator reference scenario for 3,025 p.e. of reported load: 110,981 kWh per year (53.2 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.