Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Arzignano_Via_Altura
Italy · official identifier IT05000000000043
2,360,000h-e design capacity (2022) · 2nd of 3,726
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000043 · reported size 2,360,000 h-e design capacity · received load 991,650 h-e · reported treatment: PST · data year 2022. 2nd of 3,726 records with reported size in the inventory of Italy; 2.3 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 45.5020, 11.3770 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2015-07-20 · The Veneto Region approved and authorised the project to upgrade Arzignano’s industrial and municipal wastewater plant. Región del Véneto
- 2023 · The regional bulletin corrected the expiry date of the environmental assessment for the Arzignano upgrade project to 31 December 2030. Región del Véneto
Other published data
| Mean annual volume treated reported in the 2022 cycle | 12,261,576 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 991,650 p.e. of reported load; equivalent average load 684,239 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (198,330 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Trissino_pranovi | 4.5 km | 127,500 | 63,029 | primary, secondary and tertiary |
| Montecchio_maggiore_via_callesella | 4.8 km | 70,000 | 29,413 | primary and secondary |
| Montebello_vicentino_via_fracanzana | 7.1 km | 472,000 | 266,097 | primary and secondary |
| Creazzo_via_brescia | 8.5 km | 12,500 | 10,987 | primary, secondary and tertiary |
| Vicenza_sant_agostino | 11.0 km | 100,000 | 87,897 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Arzignano_Via_Altura report?
Reported size: 2,360,000 h-e design capacity. Received load: 991,650 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Arzignano_Via_Altura?
Aguas SB simulator reference scenario for 991,650 p.e. of reported load: 21,240,908 kWh per year (31.0 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.