Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP BARI_OVEST

Italy · official identifier IT160000000066

360,000h-e design capacity (2022) · 47th of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT160000000066 · reported size 360,000 h-e design capacity · received load 330,509 h-e · reported treatment: PST · data year 2022. 47th of 3,726 records with reported size in the inventory of Italy; 0.34 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.2 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

360,000h-e design capacity
330,509h-e received load (2022)
92 %reported load/capacity ratio (not hydraulic utilisation)
47th of 3,726by reported size among the 3,726 records with a size in the inventory · 0.34 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates41.1251, 16.8121 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025-11-12 · On 12 November 2025, Apulia authorised the discharge of Bari Ovest effluent into the Adriatic Sea through a submarine outfall. Apulia Region

Other published data

Mean annual volume treated reported in the 2022 cycle19,562,540 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

7,744,698reference kWh per year for this load
34.0kWh per h-e (average load) per year
1,161,705€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 330,509 p.e. of reported load; equivalent average load 228,052 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

24.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (66,102 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Bitonto9.2 km79,33273,159primary, secondary and tertiary
Bari_est9.4 km389,000409,893primary, secondary and tertiary
Giovinazzo12.1 km24,00027,711primary, secondary and tertiary
Casamassima_nuovo17.8 km17,00018,485primary, secondary and tertiary
Molfetta21.9 km84,803101,409primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP BARI_OVEST report?

Reported size: 360,000 h-e design capacity. Received load: 330,509 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of BARI_OVEST?

Aguas SB simulator reference scenario for 330,509 p.e. of reported load: 7,744,698 kWh per year (34.0 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.