Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Bergantino_Via_Vaccaro

Italy · official identifier IT05000000000273

3,000h-e design capacity (2022) · 2502nd of 3,726 (tied with 156 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000273 · reported size 3,000 h-e design capacity · received load 1,823 h-e · reported treatment: PST · data year 2022. 2502nd of 3,726 records with reported size in the inventory of Italy (tied with 156 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.9 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

3,000h-e design capacity
1,823h-e received load (2022)
61 %reported load/capacity ratio (not hydraulic utilisation)
2502nd of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 156 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.0660, 11.2510 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

69,909reference kWh per year for this load
55.5kWh per h-e (average load) per year
10,486€ per year at 0.15 €/kWh
62 %share of energy used for aeration

what this estimate is · Inputs: 1,823 p.e. of reported load; equivalent average load 1,259 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (365 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Castelnovo_bariano_via_d_alighieri4.9 km1,000625primary, secondary and tertiary
Dp02006101_sermide8.1 km10,0004,947primary, secondary and tertiary
Dp02003801_ostiglia9.1 km6,2007,158primary and secondary
Castelmassa_via_sarta9.5 km50,00031,249primary, secondary and tertiary
Dp02004901_revere9.8 km3,2002,641primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bergantino_Via_Vaccaro report?

Reported size: 3,000 h-e design capacity. Received load: 1,823 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Bergantino_Via_Vaccaro?

Aguas SB simulator reference scenario for 1,823 p.e. of reported load: 69,909 kWh per year (55.5 kWh per p.e. of average load), with aeration as 62 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.