Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP BONEFRO_LOC_CAPRIOLO
Italy · official identifier IT14Q90000002492
2,754h-e design capacity (2022) · 2684th of 3,726
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT14Q90000002492 · reported size 2,754 h-e design capacity · received load 1,500 h-e · reported treatment: PS · data year 2022. 2684th of 3,726 records with reported size in the inventory of Italy; < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.3 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 41.7052, 14.9418 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,500 p.e. of reported load; equivalent average load 1,035 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (300 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Santa_croce_di_m_fontana_vecchia | 4.3 km | 5,900 | 5,551 | primary, secondary and tertiary |
| Casacalenda_piano_dei | 8.0 km | 4,500 | 3,501 | primary, secondary and tertiary |
| Sant_elia_a_p_pianella | 10.4 km | 2,800 | 2,704 | primary, secondary and tertiary |
| Larino_fonte_di_basso | 11.5 km | 10,083 | 8,590 | primary, secondary and tertiary |
| Carlantino | 12.5 km | 1,324 | 1,372 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BONEFRO_LOC_CAPRIOLO report?
Reported size: 2,754 h-e design capacity. Received load: 1,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of BONEFRO_LOC_CAPRIOLO?
Aguas SB simulator reference scenario for 1,500 p.e. of reported load: 58,427 kWh per year (56.5 kWh per p.e. of average load), with aeration as 61 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.