Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Casale_Sul_Sile_Loc_Conscio_Via_Peschiere

Italy · official identifier IT05Q90000003363

2,500h-e design capacity (2022) · 2723rd of 3,726 (tied with 89 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05Q90000003363 · reported size 2,500 h-e design capacity · received load 691 h-e · reported treatment: PS · data year 2022. 2723rd of 3,726 records with reported size in the inventory of Italy (tied with 89 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.4 km · 15 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,500h-e design capacity
691h-e received load (2022)
28 %reported load/capacity ratio (not hydraulic utilisation)
2723rd of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 89 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.6120, 12.2820 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

32,008reference kWh per year for this load
67.2kWh per h-e (average load) per year
4,801€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 691 p.e. of reported load; equivalent average load 476 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (138 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Casale_sul_sile_via_della_ricerca1.4 km340103primary and secondary
Casier_dosson,_via_bigonzo1.5 km12,0008,150primary, secondary and tertiary
Preganziol_via_schiavonia4.0 km17,11212,651primary, secondary and tertiary
Treviso_sant_antonino,_via_pavese4.1 km70,00072,343primary, secondary and tertiary
Silea_via_duca_d_aosta_loc_s_elena4.2 km1,8601,762primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Casale_Sul_Sile_Loc_Conscio_Via_Peschiere report?

Reported size: 2,500 h-e design capacity. Received load: 691 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Casale_Sul_Sile_Loc_Conscio_Via_Peschiere?

Aguas SB simulator reference scenario for 691 p.e. of reported load: 32,008 kWh per year (67.2 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.