Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP COL_FABRIANO_3
Italy · official identifier IT11000000000108
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT11000000000108 · reported size not reported h-e design capacity · received load 1,027 h-e · data year 2022. nearest inventoried plant at 2.2 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 43.3395, 12.9127 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,027 p.e. of reported load; equivalent average load 707 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (205 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Fabriano_via_bachelet_dep | 2.2 km | 35,000 | 25,810 | primary, secondary and tertiary |
| Cerreto_d_esi_monterustico_dep | 6.5 km | 3,500 | 3,092 | primary, secondary and tertiary |
| Cerreto_d_esi_pian_del_morro_dep | 7.0 km | 500 | 41 | primary and secondary |
| Matelica_dep | 9.1 km | 14,400 | 8,844 | primary, secondary and tertiary |
| Sassoferrato_loc_fornaci_dep | 10.9 km | 6,000 | 4,828 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COL_FABRIANO_3 report?
Reported size: not reported h-e design capacity. Received load: 1,027 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COL_FABRIANO_3?
Aguas SB simulator reference scenario for 1,027 p.e. of reported load: 43,401 kWh per year (61.4 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.