Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP COL_MONTEFANO_N_1

Italy · official identifier IT11000000000205

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT11000000000205 · reported size not reported h-e design capacity · received load 185 h-e · data year 2022. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

Aerial image withheld. The reported coordinate matches another facility or is missing: the location awaits cross-checking. The table retains the reported data.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
185h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.4108, 13.4313 approximate position · location awaiting cross-checking
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

Another record in the same inventory lies within 50 m: COL_CASONE · IT11000000000201, COL_MONTEFANO_N_2 · IT11000000000206, COL_MONTEFANO_N_3 · IT11000000000207, COL_ZONA_PIPBELDILETTO_N_1 · IT11000000000210, COL_ZONA_PIPBELDILETTO_N_2 · IT11000000000211, COL_MONTEFIORE · IT11000000000212. The source does not state whether it is the same facility.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

15,002reference kWh per year for this load
117.5kWh per h-e (average load) per year
2,250€ per year at 0.15 €/kWh
38 %share of energy used for aeration

what this estimate is · Inputs: 185 p.e. of reported load; equivalent average load 128 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (37 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

Nearby plants are not shown: this plant's location awaits cross-checking.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COL_MONTEFANO_N_1 report?

Reported size: not reported h-e design capacity. Received load: 185 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COL_MONTEFANO_N_1?

Aguas SB simulator reference scenario for 185 p.e. of reported load: 15,002 kWh per year (117.5 kWh per p.e. of average load), with aeration as 38 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.