WWTP Conegliano_Via_Ca_Di_Villa_Campolongo

Italy · official identifier IT05000000000147

70,000h-e design capacity (2022) · 279th of 3,726 (tied with 12 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000147 · reported size 70,000 h-e design capacity · received load 43,248 h-e · reported treatment: PST · data year 2022. 279th of 3,726 records with reported size in the inventory of Italy (tied with 12 others); 0.07 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.1 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

70,000h-e design capacity
43,248h-e received load (2022)
62 %reported load/capacity ratio (not hydraulic utilisation)
279th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 12 others) · 0.07 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.8660, 12.3260 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,479,938reference kWh per year for this load
49.6kWh per h-e (average load) per year
221,991€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 43,248 p.e. of reported load; equivalent average load 29,843 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

3.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (8,650 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Mareno_di_piave_loc_ramera1.1 km1,000406primary and secondary
Mareno_di_piave_piazza_vittorio_emanuele_iii3.1 km7,0004,400primary and secondary
Codogne_zi_cimavilla4.1 km300139primary and secondary
San_vendemiano_via_fontane4.6 km12,5008,926primary and secondary
Vazzola_visna_,_via_montegrappa8.0 km4,0003,914primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Conegliano_Via_Ca_Di_Villa_Campolongo report?

Reported size: 70,000 h-e design capacity. Received load: 43,248 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Conegliano_Via_Ca_Di_Villa_Campolongo?

Aguas SB simulator reference scenario for 43,248 p.e. of reported load: 1,479,938 kWh per year (49.6 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.