Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP D_Falcade_Loc_Caviola

Italy · official identifier IT05Q170000000059010

9,700h-e design capacity (2022) · 1377th of 3,726 (tied with 2 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05Q170000000059010 · reported size 9,700 h-e design capacity · received load 5,818 h-e · reported treatment: PST · data year 2022. 1377th of 3,726 records with reported size in the inventory of Italy (tied with 2 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.1 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

9,700h-e design capacity
5,818h-e received load (2022)
60 %reported load/capacity ratio (not hydraulic utilisation)
1377th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 2 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates46.3620, 11.9000 precision reported by the source: level 0 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

203,184reference kWh per year for this load
50.6kWh per h-e (average load) per year
30,478€ per year at 0.15 €/kWh
68 %share of energy used for aeration

what this estimate is · Inputs: 5,818 p.e. of reported load; equivalent average load 4,016 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,164 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Rocca_pietore_masare9.1 km4,0002,189primary and secondary
Alleghe_coldemies11.0 km100197primary and secondary
Depuratore_di_san_martino_di_castrozza_camoi15.4 km24,0009,404primary, secondary and tertiary
La_valle_agordina_le_campe15.9 km7,5004,981primary, secondary and tertiary
Depuratore_di_campitello_di_fassa17.3 km20,00016,830primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP D_Falcade_Loc_Caviola report?

Reported size: 9,700 h-e design capacity. Received load: 5,818 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of D_Falcade_Loc_Caviola?

Aguas SB simulator reference scenario for 5,818 p.e. of reported load: 203,184 kWh per year (50.6 kWh per p.e. of average load), with aeration as 68 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.