Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP DEPURATORE_CO_B_I_S_

Italy · official identifier IT12000000000320

90,000h-e design capacity (2022) · 201st of 3,726 (tied with 20 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12000000000320 · reported size 90,000 h-e design capacity · received load 85,500 h-e · reported treatment: PST · data year 2022. 201st of 3,726 records with reported size in the inventory of Italy (tied with 20 others); 0.09 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.3 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

90,000h-e design capacity
85,500h-e received load (2022)
95 %reported load/capacity ratio (not hydraulic utilisation)
201st of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 20 others) · 0.09 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates42.0604, 12.3103 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

2,547,409reference kWh per year for this load
43.2kWh per h-e (average load) per year
382,111€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 85,500 p.e. of reported load; equivalent average load 58,995 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

6.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (17,100 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Depuratore Urbano Formello-Loc Baccanale (Comparto B)5.6 km3,0002,850primary and secondary
Depuratore Urbano Formello-Le Rughe (Basse)6.4 km800760primary and secondary
Cerquetta6.8 km1,5001,425primary and secondary
Depuratore Urbano Formello-Prato la Corte7.8 km8,0007,600primary, secondary and tertiary
Dep_loc_s_lucia8.9 km10,0009,500primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DEPURATORE_CO_B_I_S_ report?

Reported size: 90,000 h-e design capacity. Received load: 85,500 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of DEPURATORE_CO_B_I_S_?

Aguas SB simulator reference scenario for 85,500 p.e. of reported load: 2,547,409 kWh per year (43.2 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.