Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP DP01209001_Lonate_Pozzolo

Italy · official identifier IT03160128000384

397,224h-e design capacity (2022) · 43rd of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160128000384 · reported size 397,224 h-e design capacity · received load 365,665 h-e · reported treatment: PST · data year 2022. 43rd of 3,726 records with reported size in the inventory of Italy; 0.38 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

397,224h-e design capacity
365,665h-e received load (2022)
92 %reported load/capacity ratio (not hydraulic utilisation)
43rd of 3,726by reported size among the 3,726 records with a size in the inventory · 0.38 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.5764, 8.7613 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2014-07-03 · The conference of municipalities approved a partial plan including works on the Sant’Antonino treatment system in Lonate Pozzolo. Varese Water District Authority

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

8,493,796reference kWh per year for this load
33.7kWh per h-e (average load) per year
1,274,069€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 365,665 p.e. of reported load; equivalent average load 252,309 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

26.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (73,133 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp01522601_turbigo6.8 km46,60011,865primary, secondary and tertiary
Bellinzago Novarese7.0 km36,00023,111primary, secondary and tertiary
Dp01210801_olgiate_olona11.7 km137,00091,774primary, secondary and tertiary
Dp01212301_somma_lombardo_ca_bagaggio12.2 km20,00018,323primary, secondary and tertiary
Dp01504601_canegrate_olona_nord14.2 km151,800137,958primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DP01209001_Lonate_Pozzolo report?

Reported size: 397,224 h-e design capacity. Received load: 365,665 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of DP01209001_Lonate_Pozzolo?

Aguas SB simulator reference scenario for 365,665 p.e. of reported load: 8,493,796 kWh per year (33.7 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.