Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP DP01314701_Merone
Italy · official identifier IT03160128000417
125,000h-e design capacity (2022) · 136th of 3,726
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160128000417 · reported size 125,000 h-e design capacity · received load 117,711 h-e · reported treatment: PST · data year 2022. 136th of 3,726 records with reported size in the inventory of Italy; 0.12 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.7681, 9.2431 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 117,711 p.e. of reported load; equivalent average load 81,220 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (23,542 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Dp09705601_nibionno | 2.5 km | 30,000 | 42,845 | primary, secondary and tertiary |
| Dp01314301_mariano_comense | 10.8 km | 60,000 | 60,000 | primary, secondary and tertiary |
| Dp01304601_carimate | 12.8 km | 98,000 | 73,500 | primary, secondary and tertiary |
| Dp01307501_como | 13.5 km | 196,000 | 170,272 | primary, secondary and tertiary |
| Dp09708301_valmadrera | 13.5 km | 99,303 | 69,394 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DP01314701_Merone report?
Reported size: 125,000 h-e design capacity. Received load: 117,711 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of DP01314701_Merone?
Aguas SB simulator reference scenario for 117,711 p.e. of reported load: 3,286,747 kWh per year (40.5 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.