Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP DP01711601_Muscoline
Italy · official identifier IT03160129000579
2,600h-e design capacity (2022) · 2707th of 3,726 (tied with 11 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160129000579 · reported size 2,600 h-e design capacity · received load 2,763 h-e · reported treatment: PST · data year 2022. 2707th of 3,726 records with reported size in the inventory of Italy (tied with 11 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.4 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.5588, 10.4520 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,763 p.e. of reported load; equivalent average load 1,908 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (553 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Dp01707703_gavardo-Intercomunale | 1.4 km | 36,000 | 19,158 | primary, secondary and tertiary |
| Dp01703302_calvagese_della_riviera_mocasina | 2.8 km | 1,000 | 1,722 | primary, secondary and tertiary |
| Dp01703303_calvagese_della_riviera_carzago | 4.0 km | 1,000 | 2,042 | primary, secondary and tertiary |
| Dp01712001_nuvolera | 7.8 km | 26,500 | 19,140 | primary, secondary and tertiary |
| Dp01701401_bedizzole_pontenove | 8.0 km | 12,000 | 10,746 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DP01711601_Muscoline report?
Reported size: 2,600 h-e design capacity. Received load: 2,763 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of DP01711601_Muscoline?
Aguas SB simulator reference scenario for 2,763 p.e. of reported load: 102,225 kWh per year (53.6 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.