Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP DP01803402_Casorate_Primo_Trovo

Italy · official identifier IT03Q230000011

15,000h-e design capacity (2022) · 1013th of 3,726 (tied with 53 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03Q230000011 · reported size 15,000 h-e design capacity · received load 8,664 h-e · reported treatment: PST · data year 2022. 1013th of 3,726 records with reported size in the inventory of Italy (tied with 53 others); 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.9 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

15,000h-e design capacity
8,664h-e received load (2022)
58 %reported load/capacity ratio (not hydraulic utilisation)
1013th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 53 others) · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.2849, 9.0248 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

317,404reference kWh per year for this load
53.1kWh per h-e (average load) per year
47,611€ per year at 0.15 €/kWh
41 %share of energy used for aeration

what this estimate is · Inputs: 8,664 p.e. of reported load; equivalent average load 5,979 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,733 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp01515101_motta_visconti2.9 km8,0007,603primary, secondary and tertiary
Dp01523601_vernate2.9 km3,9503,684primary, secondary and tertiary
Rsfg0181630101_trivolzio3.2 kmnot reported24not reported
Dp01801401_bereguardo3.7 km8501,955primary, secondary and tertiary
Dp01816301_trivolzio_capoluogo_viale_dell_industria3.9 km1,3501,996primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DP01803402_Casorate_Primo_Trovo report?

Reported size: 15,000 h-e design capacity. Received load: 8,664 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of DP01803402_Casorate_Primo_Trovo?

Aguas SB simulator reference scenario for 8,664 p.e. of reported load: 317,404 kWh per year (53.1 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.