Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP DP01805301_Copiano
Italy · official identifier IT03160129000641
3,800h-e design capacity (2022) · 2342nd of 3,726 (tied with 6 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160129000641 · reported size 3,800 h-e design capacity · received load 3,320 h-e · reported treatment: PST · data year 2022. 2342nd of 3,726 records with reported size in the inventory of Italy (tied with 6 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.3 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 45.1859, 9.3264 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,320 p.e. of reported load; equivalent average load 2,291 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (664 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Dp01818001_villanterio | 3.3 km | 9,300 | 6,487 | primary, secondary and tertiary |
| Dp01801301_belgioioso | 4.1 km | 5,700 | 12,464 | primary, secondary and tertiary |
| Dp01800405_albuzzano_ovest | 5.2 km | 15,000 | 9,487 | primary, secondary and tertiary |
| Dp01806001_cura_carpignano | 5.9 km | 550 | 3,097 | primary and secondary |
| Dp01808102_linarolo | 6.5 km | 5,000 | 4,146 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DP01805301_Copiano report?
Reported size: 3,800 h-e design capacity. Received load: 3,320 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of DP01805301_Copiano?
Aguas SB simulator reference scenario for 3,320 p.e. of reported load: 120,837 kWh per year (52.7 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.