Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP DP01811001_Pavia

Italy · official identifier IT03160129000655

130,000h-e design capacity (2022) · 127th of 3,726 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160129000655 · reported size 130,000 h-e design capacity · received load 138,065 h-e · reported treatment: PST · data year 2022. 127th of 3,726 records with reported size in the inventory of Italy (tied with 3 others); 0.12 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

130,000h-e design capacity
138,065h-e received load (2022)
106 %reported load/capacity ratio (not hydraulic utilisation)
127th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 3 others) · 0.12 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates45.1775, 9.1790 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,731,716reference kWh per year for this load
39.2kWh per h-e (average load) per year
559,757€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 138,065 p.e. of reported load; equivalent average load 95,265 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

10.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (27,613 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp01816206_travaco_siccomario_rotta3.5 km2,5002,500primary, secondary and tertiary
Dp01804101_cava_manara6.3 km15,0008,483primary, secondary and tertiary
Dp01800405_albuzzano_ovest6.4 km15,0009,487primary, secondary and tertiary
Dp01806001_cura_carpignano7.5 km5503,097primary and secondary
Dp01808102_linarolo7.7 km5,0004,146primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DP01811001_Pavia report?

Reported size: 130,000 h-e design capacity. Received load: 138,065 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of DP01811001_Pavia?

Aguas SB simulator reference scenario for 138,065 p.e. of reported load: 3,731,716 kWh per year (39.2 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.