Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP DP02002801_Guidizzolo

Italy · official identifier IT03160129000722

17,500h-e design capacity (2022) · 958th of 3,726 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT03160129000722 · reported size 17,500 h-e design capacity · received load 10,723 h-e · reported treatment: PST · data year 2022. 958th of 3,726 records with reported size in the inventory of Italy (tied with 3 others); 0.02 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.3 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

17,500h-e design capacity
10,723h-e received load (2022)
61 %reported load/capacity ratio (not hydraulic utilisation)
958th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 3 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.2830, 10.5908 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

387,690reference kWh per year for this load
52.4kWh per h-e (average load) per year
58,154€ per year at 0.15 €/kWh
42 %share of energy used for aeration

what this estimate is · Inputs: 10,723 p.e. of reported load; equivalent average load 7,400 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (2,145 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp02007003_volta_mantovana_zona_sud_ovest6.3 km2,5002,079primary and secondary
Dp02002601_goito7.5 km8,0007,952primary, secondary and tertiary
Dp02007001_volta_mantovana_zona_nord_est8.0 km2,4502,349primary and secondary
Dp02005101_rodigo9.9 km2,1672,046primary, secondary and tertiary
Dp02000203_asola_castelnuovo10.9 km3,5003,693primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP DP02002801_Guidizzolo report?

Reported size: 17,500 h-e design capacity. Received load: 10,723 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of DP02002801_Guidizzolo?

Aguas SB simulator reference scenario for 10,723 p.e. of reported load: 387,690 kWh per year (52.4 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.