Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Ferruzzano - Saccuti
Italy · official identifier IT18Q90000003083
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000003083 · reported size not reported h-e design capacity · received load 400 h-e · data year 2022. nearest inventoried plant at 0.9 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.0342, 16.0910 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 400 p.e. of reported load; equivalent average load 276 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (80 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ferruzzano - Centro | 0.9 km | not reported | 400 | not reported |
| Ferruzzano - Canalello | 3.3 km | 2,800 | 1,305 | primary, secondary and tertiary |
| Plati - Cirella | 3.6 km | 700 | 590 | primary, secondary and tertiary |
| Ferruzzano - C.Da Mingiola | 4.4 km | not reported | 270 | not reported |
| Africo - Artusa | 4.8 km | 2,000 | 3,204 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Ferruzzano - Saccuti report?
Reported size: not reported h-e design capacity. Received load: 400 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Ferruzzano - Saccuti?
Aguas SB simulator reference scenario for 400 p.e. of reported load: 21,849 kWh per year (79.2 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.