Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Gerocarne - Paese
Italy · official identifier IT18Q13000000024
1,300h-e design capacity (2022) · 3137th of 3,726 (tied with 10 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q13000000024 · reported size 1,300 h-e design capacity · received load 500 h-e · reported treatment: PST · data year 2022. 3137th of 3,726 records with reported size in the inventory of Italy (tied with 10 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.3 km · 20 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.5896, 16.2123 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 500 p.e. of reported load; equivalent average load 345 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (100 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Soriano Calabro - Spinna Curcio | 1.3 km | 5,000 | 4,002 | primary, secondary and tertiary |
| Gerocarne - Carruso | 1.3 km | 40 | 40 | primary, secondary and tertiary |
| Gerocarne - Pettinaro | 1.5 km | 80 | 80 | primary, secondary and tertiary |
| Sorianello - Fornaci | 1.6 km | 2,078 | 2,330 | primary, secondary and tertiary |
| Gerocarne - Bondanzia | 1.6 km | 130 | 100 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Gerocarne - Paese report?
Reported size: 1,300 h-e design capacity. Received load: 500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Gerocarne - Paese?
Aguas SB simulator reference scenario for 500 p.e. of reported load: 24,819 kWh per year (71.9 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.