Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP GIUSTINIANELLA
Italy · official identifier IT12Q17000000032
3,000h-e design capacity (2022) · 2502nd of 3,726 (tied with 156 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12Q17000000032 · reported size 3,000 h-e design capacity · received load 2,850 h-e · reported treatment: PS · data year 2022. 2502nd of 3,726 records with reported size in the inventory of Italy (tied with 156 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.4 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 41.9912, 12.4086 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,850 p.e. of reported load; equivalent average load 1,967 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (570 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cerquetta | 4.4 km | 1,500 | 1,425 | primary and secondary |
| Depuratore Urbano Formello-Prato la Corte | 5.9 km | 8,000 | 7,600 | primary, secondary and tertiary |
| Palmarola_casal_del_marmo | 6.9 km | 53,630 | 50,949 | primary, secondary and tertiary |
| Depuratore Urbano Formello-Loc Baccanale (Comparto B) | 7.5 km | 3,000 | 2,850 | primary and secondary |
| Roma_nord | 7.8 km | 780,000 | 741,000 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP GIUSTINIANELLA report?
Reported size: 3,000 h-e design capacity. Received load: 2,850 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of GIUSTINIANELLA?
Aguas SB simulator reference scenario for 2,850 p.e. of reported load: 105,095 kWh per year (53.4 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.