Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP GOVONE - FRAZ. CANOVE

Italy · official identifier IT01000000000131

240,000h-e design capacity (2022) · 64th of 3,726 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT01000000000131 · reported size 240,000 h-e design capacity · received load 197,518 h-e · reported treatment: PST · data year 2022. 64th of 3,726 records with reported size in the inventory of Italy (tied with 3 others); 0.23 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

240,000h-e design capacity
197,518h-e received load (2022)
82 %reported load/capacity ratio (not hydraulic utilisation)
64th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 3 others) · 0.23 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionyes
Statusactive
Reported coordinates44.7752, 8.1057 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2006 · In 2006, Piedmont granted funding to expand and upgrade the Canove di Govone wastewater treatment plant and extend its sewer network. Piedmont Region

Other published data

Mean annual volume treated reported in the 2022 cycle13,415,849 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L03; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,950,969reference kWh per year for this load
36.3kWh per h-e (average load) per year
742,645€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 197,518 p.e. of reported load; equivalent average load 136,289 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

14.4estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (39,504 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cisano_loc_benassea5.6 km2,5362,536primary
Neive5.8 km3,8111,780primary, secondary and tertiary
Canale - Loc. Valpone6.7 km4,8004,623primary, secondary and tertiary
San Damiano D'Asti7.8 km8,0006,150primary and secondary
Canale - Loc. Cimitero8.4 km5,0004,830primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP GOVONE - FRAZ. CANOVE report?

Reported size: 240,000 h-e design capacity. Received load: 197,518 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of GOVONE - FRAZ. CANOVE?

Aguas SB simulator reference scenario for 197,518 p.e. of reported load: 4,950,969 kWh per year (36.3 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.