Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP IDI_VENERI

Italy · official identifier IT09RT0513

250,000h-e design capacity (2022) · 59th of 3,726 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT09RT0513 · reported size 250,000 h-e design capacity · received load 137,405 h-e · reported treatment: PS · data year 2022. 59th of 3,726 records with reported size in the inventory of Italy (tied with 3 others); 0.24 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.2 km · 13 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

250,000h-e design capacity
137,405h-e received load (2022)
55 %reported load/capacity ratio (not hydraulic utilisation)
59th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 3 others) · 0.24 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.8835, 10.6674 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2023-12-31 · The Tuscany Region set the start date for the environmental permit review of the Veneri wastewater treatment plant. Tuscany Region

Other published data

Mean annual volume treated reported in the 2022 cycle3,036,622 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,717,509reference kWh per year for this load
39.2kWh per h-e (average load) per year
557,626€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 137,405 p.e. of reported load; equivalent average load 94,809 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

10estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (27,481 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Idl_pescia_capoluogo2.2 km14,00013,583primary, secondary and tertiary
Idl_torricchio3.4 km3,5003,927primary, secondary and tertiary
Idl_macchie_san_piero_tomolo3.8 km1,250293primary, secondary and tertiary
Idl_bellavista5.1 km5,0003,781primary and secondary
Idl_pittini6.5 km3,5004,067primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP IDI_VENERI report?

Reported size: 250,000 h-e design capacity. Received load: 137,405 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of IDI_VENERI?

Aguas SB simulator reference scenario for 137,405 p.e. of reported load: 3,717,509 kWh per year (39.2 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.