165,000h-e design capacity (2022) · 100th of 3,726 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT09RT0005 · reported size 165,000 h-e design capacity · received load 38,428 h-e · reported treatment: PST · data year 2022. 100th of 3,726 records with reported size in the inventory of Italy (tied with 1 others); 0.16 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.7 km · 35 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

165,000h-e design capacity
38,428h-e received load (2022)
23 %reported load/capacity ratio (not hydraulic utilisation)
100th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 1 others) · 0.16 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.8860, 11.0211 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1985-05 · The Calice wastewater treatment plant in Prato entered service in May 1985. Its facilities were nearly doubled in 2002. Municipality of Prato

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,318,744reference kWh per year for this load
49.7kWh per h-e (average load) per year
197,812€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 38,428 p.e. of reported load; equivalent average load 26,517 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (7,686 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Idl_ronco_via_ferrucci0.7 km6,0005,883primary and secondary
Idl_salceto2.6 km6,0002,711primary, secondary and tertiary
Idl_via_brunelleschi4.0 km10,0008,566primary, secondary and tertiary
Idl_montale_est4.4 km3,5004,156primary and secondary
Idl_bottegone4.8 km5,0004,860primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP IDL_CALICE report?

Reported size: 165,000 h-e design capacity. Received load: 38,428 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of IDL_CALICE?

Aguas SB simulator reference scenario for 38,428 p.e. of reported load: 1,318,744 kWh per year (49.7 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source