Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP IDL_PONTE_ALLA_SERPENNA

Italy · official identifier IT09RT0672

10,000h-e design capacity (2022) · 1255th of 3,726 (tied with 108 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT09RT0672 · reported size 10,000 h-e design capacity · received load 3,318 h-e · reported treatment: PS · data year 2022. 1255th of 3,726 records with reported size in the inventory of Italy (tied with 108 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

10,000h-e design capacity
3,318h-e received load (2022)
33 %reported load/capacity ratio (not hydraulic utilisation)
1255th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 108 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.2599, 11.2708 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

120,837reference kWh per year for this load
52.7kWh per h-e (average load) per year
18,125€ per year at 0.15 €/kWh
65 %share of energy used for aeration

what this estimate is · Inputs: 3,318 p.e. of reported load; equivalent average load 2,291 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (664 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Idl_ponte_a_tressa9.9 km99,00090,214primary, secondary and tertiary
Idl_le_tolfe10.9 km10,0009,323primary, secondary and tertiary
Idl_monteroni_d_arbia_podere_fede14.0 km12,0005,006primary, secondary and tertiary
Idl_castellina_scalo_s_claudio17.7 km10,0005,074primary and secondary
Idl_cipressi22.0 km22,00017,246primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP IDL_PONTE_ALLA_SERPENNA report?

Reported size: 10,000 h-e design capacity. Received load: 3,318 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of IDL_PONTE_ALLA_SERPENNA?

Aguas SB simulator reference scenario for 3,318 p.e. of reported load: 120,837 kWh per year (52.7 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.