WWTP IMPIANTO C.DA VALLONE ALONGI
Italy · official identifier IT19AG00G0025DE001
13,200h-e design capacity (2022) · 1108th of 3,726 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT19AG00G0025DE001 · reported size 13,200 h-e design capacity · received load 2,500 h-e · reported treatment: PS · data year 2022. 1108th of 3,726 records with reported size in the inventory of Italy (tied with 1 others); 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.4 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 37.4170, 13.6203 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,500 p.e. of reported load; equivalent average load 1,725 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (500 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Sistema Di Collettamento Aragona | 2.4 km | not reported | not reported | not reported |
| Impianto C.Da Caccarolloli | 5.9 km | 6,450 | 6,450 | primary and secondary |
| Impianto Via C Marx | 6.5 km | 4,200 | 3,200 | primary |
| Impianto C.Da Curiale (C.Da Cacici) | 6.9 km | 1,500 | 1,871 | primary and secondary |
| Sistema Di Collettamento Racalmuto | 9.8 km | not reported | not reported | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP IMPIANTO C.DA VALLONE ALONGI report?
Reported size: 13,200 h-e design capacity. Received load: 2,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of IMPIANTO C.DA VALLONE ALONGI?
Aguas SB simulator reference scenario for 2,500 p.e. of reported load: 93,227 kWh per year (54.0 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.