Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Impianto_Di_Depurazione_Treviso_Loc_S_Angelo
Italy · official identifier IT05Q150000000098040
190h-e design capacity (2022) · 3626th of 3,726 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05Q150000000098040 · reported size 190 h-e design capacity · received load 195 h-e · reported treatment: PST · data year 2022. 3626th of 3,726 records with reported size in the inventory of Italy (tied with 1 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.8 km · 14 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.6500, 12.2110 precision reported by the source: level 0 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Regulatory reference: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 195 p.e. of reported load; equivalent average load 135 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (39 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Quinto_di_treviso_via_nogare | 2.9 km | 11,000 | 6,813 | primary, secondary and tertiary |
| Impianto_di_depurazione_treviso_loc_monigo | 3.1 km | 200 | 205 | primary, secondary and tertiary |
| Paese_via_brondi | 3.6 km | 45,000 | 18,824 | primary, secondary and tertiary |
| Treviso_sant_antonino,_via_pavese | 5.1 km | 70,000 | 72,343 | primary, secondary and tertiary |
| Casier_dosson,_via_bigonzo | 6.2 km | 12,000 | 8,150 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Impianto_Di_Depurazione_Treviso_Loc_S_Angelo report?
Reported size: 190 h-e design capacity. Received load: 195 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Impianto_Di_Depurazione_Treviso_Loc_S_Angelo?
Aguas SB simulator reference scenario for 195 p.e. of reported load: 15,388 kWh per year (114.4 kWh per p.e. of average load), with aeration as 39 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.