Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP IMPIANTO_DI_LIPARI
Italy · official identifier IT19ME00G0042DE001
10,000h-e design capacity (2022) · 1255th of 3,726 (tied with 108 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT19ME00G0042DE001 · reported size 10,000 h-e design capacity · received load 10,075 h-e · reported treatment: PS · data year 2022. 1255th of 3,726 records with reported size in the inventory of Italy (tied with 108 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.4 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.4710, 14.9537 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 10,075 p.e. of reported load; equivalent average load 6,952 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,015 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Sistema_di_collettamento_lipari | 0.4 km | not reported | not reported | not reported |
| Sistema_di_collettamento_vulcano | 6.3 km | not reported | not reported | not reported |
| Impianto_d_ca_zappardino | 33.9 km | 16,000 | 9,496 | primary and secondary |
| Impianto_c_da_s_michele | 34.4 km | 10,000 | 4,465 | primary and secondary |
| Impianto_playa | 35.8 km | 20,500 | 1,080 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP IMPIANTO_DI_LIPARI report?
Reported size: 10,000 h-e design capacity. Received load: 10,075 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of IMPIANTO_DI_LIPARI?
Aguas SB simulator reference scenario for 10,075 p.e. of reported load: 365,612 kWh per year (52.6 kWh per p.e. of average load), with aeration as 42 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.