Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP LA FURCHIA
Italy · official identifier IT12Q23000000294
1,300h-e design capacity (2022) · 3137th of 3,726 (tied with 10 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT12Q23000000294 · reported size 1,300 h-e design capacity · received load 1,250 h-e · reported treatment: PST · data year 2022. 3137th of 3,726 records with reported size in the inventory of Italy (tied with 10 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 41.6869, 12.9263 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,250 p.e. of reported load; equivalent average load 863 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (250 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pischeri | 4.5 km | 2,500 | 2,475 | primary, secondary and tertiary |
| Depuratore_colubro | 6.4 km | 2,500 | 2,375 | primary, secondary and tertiary |
| Dep_com_valle_pisciana | 6.7 km | 8,000 | 7,600 | primary, secondary and tertiary |
| Sant_angelo · It12q23arl04010tp01 | 6.9 km | 12,000 | 9,800 | primary and secondary |
| Dep_com_valle_mazzone | 8.2 km | 10,000 | 9,500 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LA FURCHIA report?
Reported size: 1,300 h-e design capacity. Received load: 1,250 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of LA FURCHIA?
Aguas SB simulator reference scenario for 1,250 p.e. of reported load: 50,545 kWh per year (58.6 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.