WWTP LATISANA_LOC_PALUDO

Italy · official identifier IT06000000000029

14,000h-e design capacity (2022) · 1078th of 3,726 (tied with 20 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT06000000000029 · reported size 14,000 h-e design capacity · received load 9,066 h-e · reported treatment: PST · data year 2022. 1078th of 3,726 records with reported size in the inventory of Italy (tied with 20 others); 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.9 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

14,000h-e design capacity
9,066h-e received load (2022)
65 %reported load/capacity ratio (not hydraulic utilisation)
1078th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 20 others) · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.7710, 13.0323 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

331,127reference kWh per year for this load
52.9kWh per h-e (average load) per year
49,669€ per year at 0.15 €/kWh
41 %share of energy used for aeration

what this estimate is · Inputs: 9,066 p.e. of reported load; equivalent average load 6,255 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,813 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
San_michele_al_tagliamento_via_aldo_moro3.9 km8,0005,700primary, secondary and tertiary
Fossalta_di_portogruaro_via_europa9.4 km3,0002,800primary, secondary and tertiary
Rivignano_via_cavour11.0 km4,0002,231primary, secondary and tertiary
Fss_if01_fitodepurazione11.3 km330270primary and secondary
Lignano_sabbiadoro_loc_lovato11.3 km86,40082,538primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP LATISANA_LOC_PALUDO report?

Reported size: 14,000 h-e design capacity. Received load: 9,066 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of LATISANA_LOC_PALUDO?

Aguas SB simulator reference scenario for 9,066 p.e. of reported load: 331,127 kWh per year (52.9 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS