Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Lonigo_Via_Lore
Italy · official identifier IT05000000000056
50,000h-e design capacity (2022) · 381st of 3,726 (tied with 26 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000056 · reported size 50,000 h-e design capacity · received load 29,413 h-e · reported treatment: PS · data year 2022. 381st of 3,726 records with reported size in the inventory of Italy (tied with 26 others); 0.05 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.3 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 45.3720, 11.3760 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 29,413 p.e. of reported load; equivalent average load 20,296 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (5,883 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Arcole_loc_gazzolo | 5.3 km | 1,500 | 1,275 | primary and secondary |
| Montebello_vicentino_via_fracanzana | 7.3 km | 472,000 | 266,097 | primary and secondary |
| Orgiano_ca_losca | 7.5 km | 2,500 | 2,050 | primary, secondary and tertiary |
| San_bonifacio_palu | 8.0 km | 60,000 | 51,016 | primary, secondary and tertiary |
| Cologna_veneta_via_traversina | 9.0 km | 45,000 | 25,077 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Lonigo_Via_Lore report?
Reported size: 50,000 h-e design capacity. Received load: 29,413 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Lonigo_Via_Lore?
Aguas SB simulator reference scenario for 29,413 p.e. of reported load: 1,015,889 kWh per year (50.1 kWh per p.e. of average load), with aeration as 48 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.