2,800h-e design capacity (2022) · 2666th of 3,726 (tied with 15 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT20000000000090 · reported size 2,800 h-e design capacity · received load 2,580 h-e · reported treatment: PST · data year 2022. 2666th of 3,726 records with reported size in the inventory of Italy (tied with 15 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.0 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.2217, 9.2777 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,580 p.e. of reported load; equivalent average load 1,780 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (516 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Orgosolo_loc_combidanovo | 7.0 km | 4,800 | 4,628 | primary, secondary and tertiary |
| Nuoro_loc_su_tuvu | 10.6 km | 62,634 | 55,363 | primary, secondary and tertiary |
| Orani_loc_s_iscala_su_ponti | 12.0 km | 4,000 | 2,930 | primary, secondary and tertiary |
| Oliena_loc_murturumele | 13.1 km | 12,875 | 10,053 | primary, secondary and tertiary |
| Ollolai_loc_cucchinadorza | 15.9 km | 25,689 | 16,058 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MAMOIADA_LOC_MARAMELE report?
Reported size: 2,800 h-e design capacity. Received load: 2,580 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of MAMOIADA_LOC_MARAMELE?
Aguas SB simulator reference scenario for 2,580 p.e. of reported load: 95,952 kWh per year (53.9 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.