800,000h-e design capacity (2022) · 13th of 3,726 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT15Q15000000006 · reported size 800,000 h-e design capacity · received load 803,110 h-e · reported treatment: PS · data year 2022. 13th of 3,726 records with reported size in the inventory of Italy (tied with 1 others); 0.77 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

800,000h-e design capacity
803,110h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
13th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 1 others) · 0.77 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates41.0180, 14.2593 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2018-12-20 · On 20 December 2018, the contract to rehabilitate and upgrade the treatment stages at the Marcianise plant was signed. Campania Region

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

17,420,530reference kWh per year for this load
31.4kWh per h-e (average load) per year
2,613,080€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 803,110 p.e. of reported load; equivalent average load 554,146 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

58.6estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (160,622 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Orta_di_atella_ce_impianto_napoli_nord3.6 km886,000703,306primary, secondary and tertiary
Caivano_depuratore_di_acerra9.1 km828,000369,324primary, secondary and tertiary
Rotondi_impianto_di_rotondi_via_patricelli10.4 km30,00033,732primary and secondary
Cellole_depuratore_localita_doccia10.8 km5,0294,733primary and secondary
Sant_angelo_a_cupolo_impianto_localita_medina11.4 km1,6001,600primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP MARCIANISE_CE_DEPURATORE_DI_MARCIANISE report?

Reported size: 800,000 h-e design capacity. Received load: 803,110 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of MARCIANISE_CE_DEPURATORE_DI_MARCIANISE?

Aguas SB simulator reference scenario for 803,110 p.e. of reported load: 17,420,530 kWh per year (31.4 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.