WWTP MASSA_LUBRENSE_IMPIANTO_MASSA_CENTRO
Italy · official identifier IT15Q90000003544
28,800h-e design capacity (2022) · 682nd of 3,726 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT15Q90000003544 · reported size 28,800 h-e design capacity · received load 20,459 h-e · reported treatment: PS · data year 2022. 682nd of 3,726 records with reported size in the inventory of Italy (tied with 1 others); 0.03 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 40.6160, 14.3418 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 20,459 p.e. of reported load; equivalent average load 14,117 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,092 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Sorrento_impianto_marina_grande | 2.4 km | 30,000 | 33,630 | primary and secondary |
| Massa_lubrense_impianto_di_marina_del_cantone | 4.1 km | 2,300 | 1,905 | primary, secondary and tertiary |
| Vico_equense_collettore_punta_gradelle | 6.1 km | not reported | not reported | not reported |
| Capri_impianto_di_gasto | 9.7 km | 7,500 | 8,436 | primary and secondary |
| Capri_impianto_occhio_marino | 12.1 km | 7,500 | 7,400 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP MASSA_LUBRENSE_IMPIANTO_MASSA_CENTRO report?
Reported size: 28,800 h-e design capacity. Received load: 20,459 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of MASSA_LUBRENSE_IMPIANTO_MASSA_CENTRO?
Aguas SB simulator reference scenario for 20,459 p.e. of reported load: 719,923 kWh per year (51.0 kWh per p.e. of average load), with aeration as 43 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.