Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP MINORI_IMPIANTO_DEL_CENTRO_LOCALITA_GROTTA

Italy · official identifier IT15Q90000003711

4,909h-e design capacity (2022) · 2089th of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT15Q90000003711 · reported size 4,909 h-e design capacity · received load 4,811 h-e · reported treatment: PS · data year 2022. 2089th of 3,726 records with reported size in the inventory of Italy; < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.8 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

4,909h-e design capacity
4,811h-e received load (2022)
98 %reported load/capacity ratio (not hydraulic utilisation)
2089th of 3,726by reported size among the 3,726 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates40.6547, 14.6346 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

169,969reference kWh per year for this load
51.2kWh per h-e (average load) per year
25,495€ per year at 0.15 €/kWh
67 %share of energy used for aeration

what this estimate is · Inputs: 4,811 p.e. of reported load; equivalent average load 3,319 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.4estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (962 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Collettamento_residuo_agglomerato_maiori0.8 kmnot reportednot reportednot reported
Maiori_depuratore_di_maiori0.9 km11,19911,200primary and secondary
Collettamento_residuo_agglomerato_ravello2.2 kmnot reportednot reportednot reported
Atrani_impianto_consortile_condotta_sottomarina3.0 km5,0005,000primary and secondary
Amalfi_depuratore_di_amalfi3.8 km17,9409,186primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP MINORI_IMPIANTO_DEL_CENTRO_LOCALITA_GROTTA report?

Reported size: 4,909 h-e design capacity. Received load: 4,811 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of MINORI_IMPIANTO_DEL_CENTRO_LOCALITA_GROTTA?

Aguas SB simulator reference scenario for 4,811 p.e. of reported load: 169,969 kWh per year (51.2 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.