Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Mormanno - Malinieri

Italy · official identifier IT18Q90000002722

1,000h-e design capacity (2022) · 3192nd of 3,726 (tied with 111 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000002722 · reported size 1,000 h-e design capacity · data year 2022. 3192nd of 3,726 records with reported size in the inventory of Italy (tied with 111 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.4 km · 18 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,000h-e design capacity
3192nd of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 111 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates39.6455, 16.3929 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
San Demetrio Corone - Sant'Agata1.4 km150100primary, secondary and tertiary
Mormanno - Salviera3.4 km3,0002,642primary, secondary and tertiary
San Demetrio Corone - San Nicola4.0 km100100primary, secondary and tertiary
Celico - Mulinelle5.9 km2,3002,198primary, secondary and tertiary
Corigliano Calabro - Cantinella7.0 km4,8007,000primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Mormanno - Malinieri report?

Reported size: 1,000 h-e design capacity. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.