Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Peschiera_Del_Garda_Paradiso

Italy · official identifier IT05000000000023

422,000h-e design capacity (2022) · 39th of 3,726

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000023 · reported size 422,000 h-e design capacity · received load 358,518 h-e · reported treatment: PST · data year 2022. 39th of 3,726 records with reported size in the inventory of Italy; 0.40 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.9 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

422,000h-e design capacity
358,518h-e received load (2022)
85 %reported load/capacity ratio (not hydraulic utilisation)
39th of 3,726by reported size among the 3,726 records with a size in the inventory · 0.40 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates45.4240, 10.7020 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2024-06-03 · Veneto issued its environmental screening decision on the capacity of the Peschiera del Garda wastewater treatment plant. Veneto Region

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

8,342,079reference kWh per year for this load
33.7kWh per h-e (average load) per year
1,251,312€ per year at 0.15 €/kWh
55 %share of energy used for aeration

what this estimate is · Inputs: 358,518 p.e. of reported load; equivalent average load 247,379 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

26.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (71,704 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dp02004402_ponti_sul_mincio_marchino2.9 km300103primary and secondary
Dp02003601_monzambano4.4 km2,5002,955primary and secondary
Castelnuovo_del_garda_ferratella4.9 km4,0002,604primary, secondary and tertiary
Dp01715101_pozzolengo5.5 km2,5004,056primary, secondary and tertiary
Sommacampagna_via_dell_industria11.5 km36,00029,521primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Peschiera_Del_Garda_Paradiso report?

Reported size: 422,000 h-e design capacity. Received load: 358,518 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Peschiera_Del_Garda_Paradiso?

Aguas SB simulator reference scenario for 358,518 p.e. of reported load: 8,342,079 kWh per year (33.7 kWh per p.e. of average load), with aeration as 55 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.